O Scale Logo  O Scale Progress Summer-Fall 2013 O Scale Progress-Summer-Fall 2013 GSMRM Logo
  Updated: January 12, 2021 
Home Visit Our Layouts Theme Days Newsletter History Media Memberships Contact Members
previous next 25 images

O Scale Progress-Summer-Fall 2013

-> Click thumbnail image for larger view and more information, click < or > on top menu bar to scroll pictures, or home icon to return.

--Pictures by Jeff Rowe unless otherwise noted.

During the summer months, we concentrated on coloring rock castings on one section of the south mountain. This work continued through the fall.

Infra red location detectors were added to the Zenith Division blocks. This provides operators better information on train locations in obstructed locations. The project to convert signal controllers to DCC compatible operation was started and about 30 signals have been converted so far along the Departure and Arrival loops. Using DCC controllers greatly simplifies the wiring and allows easy signal logic programming with OSCI/JMRI. Also, signals were added to the Passenger yard leads.

The OSCI computer was replaced with a similar unit due to an apparent virus problem. The new computer has improved video cards and will be set up with three monitors for overall layout view, division views, and dispatcher and throttle views. In addition, there is a monitor on the walkway for viewing the layout status. --Jeff Rowe, O Scale TrainMaster

There may be more than one page of index pictures. On each page, click pictures to enlarge and then follow navigation arrows to next or preceeding pictures.


O Scale Progress-Summer-Fall 2013

Batch of 12 block detectors, J. Rowe, June 2013
Batch of 12 block detectors, J. Rowe, June 2013
Rock coloring, Jeff Heller, 26 July 2013
Rock coloring, Jeff Heller, 26 July 2013
Rock coloring, Jeff Heller, 26 July 2013
Rock coloring, Jeff Heller, 26 July 2013
Rock coloring, Jeff Heller, 26 July 2013
Rock coloring, Jeff Heller, 26 July 2013
Access Point at breaker panel
Access Point at breaker panel
Cal Zephyr in yard, 9aug13
Cal Zephyr in yard, 9aug13
Post Pass signals 9 Aug 13
Post Pass signals 9 Aug 13
Post Pass signals 9 Aug 13
Post Pass signals 9 Aug 13
Post Road signals,before DCC,9 Aug 13
Post Road signals,before DCC,9 Aug 13
Post Road signals , with DCC, 9 Aug 13
Post Road signals , with DCC, 9 Aug 13
Post Road signals 9 Aug 13
Post Road signals 9 Aug 13
Post Road signals 9 Aug 13
Post Road signals 9 Aug 13
Post Psss Pw, P1-2 signals 9 Aug 13
Post Psss Pw, P1-2 signals 9 Aug 13
Post Road signals 9 Aug 13
Post Road signals 9 Aug 13
Arrival Reverse Relay board
Arrival Reverse Relay board
Post crossing dwarf signals - 2
Post crossing dwarf signals - 2
NEC1 at Arrival
NEC1 at Arrival
DCC Programming track
DCC Programming track
Programming manuals
Programming manuals
Walt, Gene Dangle visit 20oct13
Walt, Gene Dangle visit 20oct13
John Engel's Daylight Train, By Morris Lyons, 2Nov13 - 4
John Engel's Daylight Train, By Morris Lyons, 2Nov13 - 4
Eureak Yard, 2Nov13, by Morris Lyons
Eureak Yard, 2Nov13, by Morris Lyons
Setback Post Rd Panel 15Nov13 jr - 6
Setback Post Rd Panel 15Nov13 jr - 6
Way Freight at Refinery, 22Dec13 - 2
Way Freight at Refinery, 22Dec13 - 2
OSCI Computer Table, 3 monitors, jr 26Dec13  - 3
OSCI Computer Table, 3 monitors, jr 26Dec13 - 3
 
O Scale Logo O Scale Home /  GSMRM Home GSMRM Logo
 Comments to O Scale Trainmaster © 2024 by GSMRM