O Scale Logo  O Scale Progress Winter-Spring 2013 GSMRM Logo
  Updated: January 12, 2021 
Home Visit Our Layouts Theme Days Newsletter History Media Memberships Contact Members
previous next 39 images

O Scale Progress-Winter-Spr 2013

During our Winter 2013 break, we concentrated on installing rock castings on one section of the south mountain. This work continued through the springtime.

Push button control of the Zenith panel was completed and work has started interfacing the panel to OSCI. When completed, all turnouts and routes of the entire layout will be controllable by OSCI. Push button control of the diesel yard turnouts was added to the main Midway Engine terminal control board so both yards can be operated from one panel.

On the Eureka and Empire On3 layout, additional scenery and trackwork in the Eureka yard area has been completed.  Several new buildings have been added and details added to others. The engine yard has a new fuel oil track and service area.

--Jeff Rowe, O Scale TrainMaster

-> Click thumbnail image for larger view and more information, click < or > on top menu bar to scroll pictures, or home icon to return.

--Pictures by Jeff Rowe unless otherwise noted.


O Scale Progress-Winter-Spr 2013

Sat workday, 12Jan2013
Sat workday, 12Jan2013
Sat workday, 12Jan2013
Sat workday, 12Jan2013
Sat workday, 12Jan2013
Sat workday, 12Jan2013
Block R2Cab &  Polarity  Relay Board
Block R2Cab & Polarity Relay Board
Block R2Cab &  Polarity  Relay Board
Block R2Cab & Polarity Relay Board
Zenith West Route Relay Board, Jan 2013 jr
Zenith West Route Relay Board, Jan 2013 jr
Zenith West Route Relay Board, Jan 2013 jr
Zenith West Route Relay Board, Jan 2013 jr
UP 3571, SD-40-2 for cleaning train, OSW, 25Jan13
UP 3571, SD-40-2 for cleaning train, OSW, 25Jan13
UP 3571, SD-40-2 for cleaning train, OSW, 25Jan13
UP 3571, SD-40-2 for cleaning train, OSW, 25Jan13
OSCI Ad Hoc net with 2Dell's a Mac and iPad 3 feb13-jr
OSCI Ad Hoc net with 2Dell's a Mac and iPad 3 feb13-jr
Using  iPad  WiThrottle 3 feb13-jr
Using iPad WiThrottle 3 feb13-jr
Using  iPad for route control 3 feb13-jr
Using iPad for route control 3 feb13-jr
Zenith OSCI boards installation Feb 2013
Zenith OSCI boards installation Feb 2013
Workday plaster crew 9 Feb13, by Jim Ambrose
Workday plaster crew 9 Feb13, by Jim Ambrose
Work day progress, 9 Feb 2013
Work day progress, 9 Feb 2013
Work day progress, 9 Feb 2013
Work day progress, 9 Feb 2013
Work day progress, 9 Feb 2013
Work day progress, 9 Feb 2013
Work day progress, 9 Feb 2013
Work day progress, 9 Feb 2013
Jim Ambrose working on Eureka yard
Jim Ambrose working on Eureka yard
Zenith OSCI Accessory & Sensor board, Feb 2013,jr
Zenith OSCI Accessory & Sensor board, Feb 2013,jr
Andy Olson building O scale Storage,15Feb13
Andy Olson building O scale Storage,15Feb13
On3, 30 Mar 13.
On3, 30 Mar 13.
On3, 30 Mar 13.
On3, 30 Mar 13.
On3, 30 Mar 13.
On3, 30 Mar 13.
On3, 30 Mar 13.
On3, 30 Mar 13.
On3, 30 Mar 13.
On3, 30 Mar 13.
On3, 30 Mar 13.
On3, 30 Mar 13.
Heat kink in Arrival yard, 3 May 2013
Heat kink in Arrival yard, 3 May 2013
Bill Darling working on heat kinks, 3 May 2013
Bill Darling working on heat kinks, 3 May 2013
John Engel, Jim Trenkle 21Apr2013, by Morris Lyons
John Engel, Jim Trenkle 21Apr2013, by Morris Lyons
 
O Scale Logo O Scale Home /  GSMRM Home GSMRM Logo
 Comments to O Scale Trainmaster © 2024 by GSMRM