GSMRM/EBMES O Scale - Progress -

  Updated: February 10, 2008 
previous next 19 images


O Scale-Winter 06

Jan 2006: New Pass yard  panel(jr)
Jan 2006: New Pass yard panel(jr)
Jan 2006: Blks 15-16 webbing
Jan 2006: Blks 15-16 webbing
Blks 15,16 webbing (Heller)
Blks 15,16 webbing (Heller)
Jan 2006: On3 trackwork at  Palisade (Ambrose)
Jan 2006: On3 trackwork at Palisade (Ambrose)
Jan 2006:New Post Panel installed
Jan 2006:New Post Panel installed
Jan 2006: Jim Dox cutting ties
Jan 2006: Jim Dox cutting ties
Feb 2006: Progress on the engine terminal continues (Dox, Rowe)
Feb 2006: Progress on the engine terminal continues (Dox, Rowe)
Blks 15,16 webbing (Heller)
Blks 15,16 webbing (Heller)
Feb 2006: Oil terminal installed (Leahy, Eugene Cabral)
Feb 2006: Oil terminal installed (Leahy, Eugene Cabral)
Feb 2006: Webbing around engine terminal (Heller)
Feb 2006: Webbing around engine terminal (Heller)
Mar 2006: New crossover between eng terminal and west lead (Rowe)
Mar 2006: New crossover between eng terminal and west lead (Rowe)
Mar 2006: Jim Ambrose at another  plaster day...
Mar 2006: Jim Ambrose at another plaster day...
Mar 2006: Jeff Rowe - night shift.
Mar 2006: Jeff Rowe - night shift.
Mar 2006: Crossover completed.
Mar 2006: Crossover completed.
Mar 2006:Mark Francis forming walkway ramp near Departure/Arrival Panels.
Mar 2006:Mark Francis forming walkway ramp near Departure/Arrival Panels.
Mar 2006:Final touches: Mark, Jeff H & Stephne
Mar 2006:Final touches: Mark, Jeff H & Stephne
March 2006 Plaster Party! Jim Dox, Jim Ambrose, Stephne Dowell. Jeff Heller,  26 Mar 06
March 2006 Plaster Party! Jim Dox, Jim Ambrose, Stephne Dowell. Jeff Heller, 26 Mar 06
Mar 2006: finishing touches!(Ambrose, Heller, Dox)
Mar 2006: finishing touches!(Ambrose, Heller, Dox)
Mar 2006: Looks good!
Mar 2006: Looks good!
 
O Scale Main Page /  GSMRM
 Comments to O Scale Trainmaster © 2008 by GSMRM